WE’RE HIRINGSkilled hands. New beginnings.Local trade roles & crew opportunities · No résumé neededFind your place
Bi-Tec SPM-4H SBS Cap Sheet — Black

Supplier product photography. Confirm your final color with a physical sample.

Bi-Tec

SPM-4H SBS Cap Sheet

QXO product C-375165 · 1 options

Selected: Black

QXO SKU 375165 · Product number BTCSPM4HB

Free, no-obligation quote. Our team confirms local availability, required quantities, compatible components, and installation pricing.

Selected option specifications

UOM
RL
Item Weight
105
Algae Resistance
No
Applicable Standards
UL Classified

About this product

BITEC SPM-4H is a hot asphalt applied, mineral surfaced, modified bitumen waterproofing membrane composed of carefully selected asphalts (bitumen) having superior modifying characteristics, blended with high quality styrene-butadiene-styrene rubber. The SPM-4H is reinforced with Spunbond Polyester fabric. Features: Impermeable to water Low temp flexibility Puncture resistant Thermally stable Resistant to acids And most bases Excellent adhesion Excellent workability Longevity Spunbond Polyester support, used as a reinforcement in APS4T has isotropic mechanical properties giving the composite membrane similar mechanical characteristics in all angular directions in relation to the membrane surface. Spunbond Polyester fabric will impart the following properties to the composite membrane: High flexibility Tear strength Puncture resistance Mechanical strength Fatigue resistance High elongation Deterioration resistance Dimensional stability SPM-4H incorporates a smooth and even application of fine sand to prevent blocking of rolls And to provide a smooth, acceptable application surface. It can be applied by using hot asphalt, torching or any BITEC APPROVED ELASTOMERIC COLD PROCESS ADHESIVE. After installation of the roofing membrane is complete, the surface may be coated with a BITEC APPROVED ROOF COATING to increase overall reflectivity of the system and/or fire rating. BITEC recommends that a period of at least 45 days elapse before roof coatings are applied. This will effectively allow the membrane To "cure" and accept the roof coating.

More from Bi-Tec

(570) 791-2020Free Estimate

Your project

Products for your quote

Save the products you like. Our team will confirm quantities, compatibility, pricing, and local availability.

Your list is empty. Explore products

Continue exploring products